Total S.A.is a French multinational integrated oil and gas company and one of the six "Supermajor" oil companies in the world. Its businesses cover the entire oil and gas chain, from crude oil and natural gas exploration and production to power generation, transportation, refining, petroleum product marketing, and international crude oil and product trading. Total is also a large-scale chemicals manufacturer.





Courtesy of www.pjk-international.com

Courtesy of www.portofantwerp.com
 

Mar 2010 – Oct 2011    1 year 8 months

Refinery Offsites control system replacement

SUBJECT

Replacement of Refinery Offsites MES platform and DCS system. New fiber optic network infrastructure. Instrumentation loop re-engineering. 160 tanks / 250 pumps / 3000 valves / 8 jetties. Multiple distirbuted DCS systems, ESD systems, 8 km redundant fiber optic network, MES, logistics scheduling, DCS and PLC control logics, multiple netwrok infrastructures (mbus, propietary valve network, Delta V, DCS).

Courtesy of www.iom.invensys.com
Courtesy of www.iom.invensys.com

TITLE: Lead E&I engineer

BUDGET: > 12.000.000 euros

LOCATIONS:
  • Total Refinery, Antwerp - Belgium
TASKS:
  • basic design (network infracstructure / system design / apllications design, instrumentation loop design specifications and scope of work, construction and implementation plan);
Courtesy of iom.invensys.com

Courtesy of en.wikipedia.com

  • budget composition for project approval;
  • procurement;
  • reporting and relationship with Total project manager.
ACHIEVEMENTS:
  • Out of 3 possible vendors: Honeywell, Invensys & Yokogawa, Invensys was selected as the new MES / DCS supplier. The offistes part will be migrated to the latest version of InFusion and will be replacing 18 controllers and DCS of the existing Yokogawa system. The work activities will be mainly the development of typicals, faceplates, graphics, sequences and back-documenting the current graphics, sequences and ActiveX software which are incorporated in the HMI. 
    Because the DCS system supports the oil movement applications, an intensive communication is necessary with the Advanced Applications Division of Invensys which will be developing the MAS (Movements Automation System) and Blender system.
  • development of custom interface models which allowed online migration from the existing Yokogawa DCS IO systems to the new IO systems;

Courtesy of www.powermag.com


STRATEGIES:
  • under design
ORGANIZATION:

 Under design

INTERACTIONS:
  • the job was as engineering contractor at CONTEC, Antwerp - Belgium.






ESD upgrade refinery units

SUBJECT

Upgrade of ESD loops (SIL certified) of 3 refinery processing units using HIMA ESD systems.

Courtesy of www.ahlundberg.com

Courtesy of www.dgi-company.com


TITLE: Lead E&I engineer

BUDGET: not revealed

LOCATIONS:
  • Total Refinery, Antwerp - Belgium
TASKS:
  • basic and detailed design (P&ID, HAZOP, ESD loop design);
  • E&I budget;
  • E&I procurement;
  • reporting and relationship with Total project engineer



Courtesy of www.controlengeurope.com

ACHIEVEMENTS:
  • under design
STRATEGIES:
  • under design
ORGANIZATION:

 

INTERACTIONS:
  • the job was as engineering contractor at CONTEC, Antwerp - Belgium.